Preparation of seedbeds for the Boro season is underway in the fields. As the water in the haor recedes quickly, cracks have formed in the soil. Water is therefore being lifted from the canal to irrigate the land for transplanting seedlings. Jilkar Haor, Sylhet, 9 December.Anis Mahmud